Phone

Florida: (954) 966 4847
California: (954) 477 9908

Address

6107 Johnson St,
Hollywood, FL 33024

150 L 160 LONG LEAD

RUTTONSHA

SKU: 150 L 160 LONG LEAD Category:

POWER SEMICONDUCTORS, THYRISTORS, DIODES, and RECTIFIERS
All styles of HOCKEY PUCK and STUD MOUNT (including METRIC Thread)
All sizes from 12 AMPS to 10,000 AMPS and from 50 VOLTS to 7,000 VOLTS

Description

POWER SEMICONDUCTORS, THYRISTORS, DIODES, and RECTIFIERS
All styles of HOCKEY PUCK and STUD MOUNT (including METRIC Thread)
All sizes from 12 AMPS to 10,000 AMPS and from 50 VOLTS to 7,000 VOLTS

Additional information

GET INSTANT QUOTE

Need Assistance?

1-800-237-8676
Hablamos Español