120 K 160 LONG LEAD

RUTTONSHA

SKU: 120 K 160 LONG LEAD Category:

Description

POWER SEMICONDUCTORS, THYRISTORS, DIODES, and RECTIFIERS
All styles of HOCKEY PUCK and STUD MOUNT (including METRIC Thread)
All sizes from 12 AMPS to 10,000 AMPS and from 50 VOLTS to 7,000 VOLTS

Additional information

Brand

RUTTONSHA